Cooperative Energy 52MW Solar Project Begins Construction
HATTIESBURG, Miss. – May 23, 2017 – Hattiesburg-based Cooperative Energy and Origis Energy USA began construction in May on a 52MW solar energy facility, which will provide clean energy to the generation and transmission cooperative’s 423,000 members across Mississippi. Origis Energy has developed and will install and operate the electric generation site, and Cooperative Energy will purchase all power produced at the location.
The 540-acre solar site is located near Sumrall in Lamar County. The site will encompass 206,892 photovoltaic solar panels when completed in December 2017. The project will create approximately 400 jobs during construction.